Preparations

The dais is re-assembled

Prepare1.JPG (49575 bytes)

The chairs are stacked up 

Prepare2.JPG (76983 bytes)

and the old vestibule cleared.

Prepare3.jPG (61929 bytes)

Work Gets Started

The old kitchen being dismantled

Old Kitchen.JPG (48862 bytes)

But we can still use the hall

hall.jpg (52980 bytes)

Soon the old kitchen is gone..

KitchenGone.jpg (31719 bytes)

..and the new toilets take shape

NewLoos.JPG (35866 bytes)

At the Front

Works starts on the steps - but hits a snag with extra solid concrete

Steps.JPG (101822 bytes)

But its cleared a few days later...

StepsGone.jpg (91899 bytes)

... and the footings go in for the Chapel...

2a (Medium).JPG (67029 bytes)

...and the new entrance.

4 (Medium).JPG (88643 bytes)

Next the walls start to rise.

2 (Medium).JPG (67244 bytes)

Meanwhile

Round at the back the new windows for the kitchen and toilets are about to go in, and the roof tiles about to go on.

8 (Medium).JPG (80873 bytes)

Soon after the windows are in and the roof finished.

May29 (2) (Medium).JPG (111382 bytes)

and inside the kitchen takes shape .... 

May29 (3) (Medium).JPG (49159 bytes)

... and is put into use.

Jun3 (6) (Medium).JPG (50555 bytes)    Jun3 (14) (Medium).JPG (46690 bytes)

At the Front

As the end of May approaches - the window and door frames go in. 

 May29 (Medium).JPG (67219 bytes) May29 (1) (Medium).JPG (77875 bytes)

and in June work starts inside

Jun3 (4) (Medium).JPG (74080 bytes) Jun3 (3) (Medium).JPG (43976 bytes) Jun3 (1) (Medium).JPG (68432 bytes)

We are getting close to raising the money too. This is our "thermometer" wall chart - drawn by Cathy MacLennon.

Jun3 (5) (Medium).JPG (29313 bytes)

By the end of June the outside brickwork is up and the joists go on. 

Jun30-1 (Medium).JPG (74667 bytes)

Inside - the new Chapel is shaping up.

Jun30-2 (Medium).JPG (73485 bytes)  Jun30-3 (Medium).JPG (76662 bytes)

By the end of July the roof is going on (after rain delays):

July22 1 (1) (Medium).JPG (78780 bytes) July25 1 (6) (Medium).JPG (71593 bytes)

But there's still plenty of work to do inside 

July22 1 (5) (Medium).JPG (78868 bytes) July22 1 (8) (Medium).JPG (71025 bytes) July22 1 (10) (Medium).JPG (68291 bytes)

By the 6th of August the roof is complete (front and back):

Aug 6 1 (1) (Medium).JPG (69433 bytes) Aug 6 1 (2) (Medium).JPG (78072 bytes) Aug 6 1 (3) (Medium).JPG (140734 bytes)

As August progresses, the doors go on, the new side entrance takes shape and inside the floors are laid. 

Aug 11(Medium).JPG (81390 bytes) Aug 18 1 (Medium).JPG (56665 bytes) Aug 18 4 (Medium).JPG (89359 bytes) Aug 18 9 (Medium).JPG (53602 bytes)

By the start of September the new doors are on - the new vestibule doors are in place. The Chapel doors are on and the Chapel is plastered. 

Sep 1-12_Vga.JPG (41709 bytes)   Sep 1- 9_Vga.JPG (54960 bytes) Sep 1-1_Vga.JPG (35755 bytes) Sep 1-10_Vga.JPG (42467 bytes)    

Towards the end of September - and the painters are in - the planter is there, the paving is being levelled, and we are nearing completion ready for our opening event. 

6_Vga.JPG (39446 bytes) 5_Vga.JPG (41469 bytes) 11_Vga.JPG (47557 bytes) 

 